掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


New Nickel Copper Discovery at Double Magic Ni-Cu Project

  • Wednesday, August 12, 2015
  • Source:中國鐵合金網

  • Keywords:Buxton Resources Limited,3.05% nickel,Double Magic Project
[Fellow]Buxton Resources Limited (ASX: BUX & BUXO) advises that it has discovered significant nickel and copper sulphide mineralization in its first reverse circulation (RC) drilling program at its 100% owned Double Magic Nickel-Copper (Ni-Cu) Project in Western Austr...
  • Assay results show RC drill hole DMRC003 at Buxton’s 100 per cent-owned Double Magic Ni-Cu project intersected 8m of massive to matrix sulphide grading 3.05% nickel and 1.87% copper, within a broader intersection of 14m @2.04% nickel and 1.36% copper
  • New nickel copper discovery very shallow, from only 47 meters down hole
  • Drill intercepts are downhole and cannot be considered as true thickness
  • Drilling continues at the Double Magic Ni-Cu Project, with a further 7 holes planned to test the remaining 6 conductors, as part of the current drilling program

Buxton Resources Limited (ASX: BUX & BUXO) advises that it has discovered significant nickel and copper sulphide mineralization in its first reverse circulation (RC) drilling program at its 100% owned Double Magic Nickel-Copper (Ni-Cu) Project in Western Australia.

Assay results have been received for the strongly mineralized section of the discovery RC drill hole DMRC003 which intersected 8 meters at 3.05% nickel and 1.87% copper from 50 meters, within a broader intersection of 14 meters at 2.04% nickel and 1.36% copper from 47 meters down hole.

DMRC003 selected, sighted and logged by Mr Derek Marshall and drilled by WBH Drilling intersected 8 meters of massive and matrix sulphides from 50 meters, whthin a 15 meter broader zone of disseminated sulphide. There were several additional disseminated sulphide zones and one 1 meter massive sulphide zone from 41m. Note, all widths are down hole as true wigths are not currently known.

Drilling continues in the main area of the Double Magic Project, with a further 7 holes planned, to test the 6 remainling conductors, as part of the current drill program.

All drill holes completed during the program have been cased for downhole EM geophysics. This downhole survey will assist with the detection of any additional off-hole EM conductors and better define the orientation of known conductive bodies. The geophysical field crew is due to arrive this week.

  • [Editor:Juan]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 怀来县| 东阳市| 麦盖提县| 威信县| 宜城市| 沙河市| 安庆市| 吉首市| 乐亭县| 兖州市| 河间市| 仙游县| 彝良县| 普宁市| 北碚区| 商河县| 新干县| 东辽县| 永和县| 乌苏市| 莎车县| 苍溪县| 安阳县| 浙江省| 南和县| 常德市| 新绛县| 永平县| 谷城县| 漾濞| 永川市| 通河县| 昔阳县| 眉山市| 平谷区| 枣阳市| 江门市| 曲麻莱县| 潜山县| 南昌市| 南溪县|