掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Copper and Molybdenum Production at Gibraltar

  • Tuesday, January 10, 2017
  • Source:ferro-alloys.com

  • Keywords:molybdenum
[Fellow] [Ferro-Alloys.com] VANCOUVER, Jan. 9, 2017 -- Taseko Mines Limited (TKO)(nyse mkt:TGB) ("Taseko" or the "Company") is pleased to announce fourth quarter copper production of 40.7 million pounds and 0.8 million pounds of molybdenum. Total production for the ye...

 [Ferro-Alloys.com] VANCOUVER, Jan. 9, 2017 -- Taseko Mines Limited (TKO)(nyse mkt:TGB) ("Taseko" or the "Company") is pleased to announce fourth quarter copper production of 40.7 million pounds and 0.8 million pounds of molybdenum. Total production for the year was 133.2 million pounds of copper and 0.9 million pounds of molybdenum (for the four months the molybdenum plant operated). Total sales for the year were 131.1 million pounds of copper and 0.9 million pounds of molybdenum.

Despite challenging weather conditions in the fourth quarter, mill throughput was maintained at a similar level to previous quarters. The 23% increase in copper production over the third quarter was mainly a result of higher copper grades, as planned, but also from improved copper recoveries. The fourth quarter was the first full quarter the molybdenum plant has operated since it was restarted in September. It operated exceptionally well with recoveries averaging approximately 50% for the quarter.

Russell Hallbauer, President and CEO of Taseko, stated, "We are extremely happy with copper and molybdenum production in the fourth quarter. It is a quarter that truly demonstrates the production and cash flow capability of Gibraltar. Higher copper and molybdenum production is having a significant positive impact on unit costs."

"Recently, the many factors that affect our profitability have aligned to create an ideal scenario. Higher production at a much lower cost, a copper price which has climbed nearly 25% since October and a weak Canadian dollar which has the Canadian dollar price of copper back to 2011/2012 levels. Each of these factors has a significant and an immediate financial impact on our business," concluded Mr. Hallbauer.

 

  • [Editor:Jiang Li Juan ]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 梅州市| 龙南县| 南通市| 南华县| 射洪县| 乌拉特后旗| 金堂县| 长乐市| 雷波县| 涞水县| 从江县| 琼结县| 浑源县| 龙门县| 宣汉县| 阳泉市| 烟台市| 青浦区| 永和县| 化州市| 合水县| 谢通门县| 宜良县| 屏南县| 和平县| 罗山县| 中超| 秦安县| 潮州市| 江油市| 枣强县| 尉犁县| 称多县| 松江区| 内江市| 周宁县| 华坪县| 石首市| 腾冲县| 肇源县| 搜索|