掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Intermin Resources begins work on a processing pathway for its vanadium resource

  • Thursday, September 21, 2017
  • Source:ferro-alloys.com

  • Keywords:vanadium
[Fellow][ferro-alloys.com] Intermin Resources Limited’s (ASX:IRC) joint venture partner at the Richmond Vanadium Project in Queensland has commenced metallurgical sampling and compilation of an updated resource.

Intermin Resources Limited’s (ASX:IRC) joint venture partner at the Richmond Vanadium Project in Queensland has commenced metallurgical sampling and compilation of an updated resource.

The aim of the metallurgical sampling is to develop a processing pathway to extract the metals (vanadium, molybdenum, nickel, copper) on a large commercial scale.

The new updated JORC 2012 resource is being compiled to take into account tenement boundary changes as part of the Queensland government’s tenement management policies.

Earlier this week, Intermin had executed the formal joint venture agreement with AXF Resources covering Intermin’s Richmond project.

AXF will sole fund and manage up to $6 million of technical beneficiation and commercialisation studies over four years to earn a 75% interest in the project.

Since 2008 Intermin has completed drilling, beneficiation test-work and directional studies at Richmond providing AXF with a substantial technical database from which to continue development.

READ NOW: Intermin Resources gets ready to unlock vanadium potential in Queensland

AXF has now reviewed the outcome of Intermin’s earlier testwork and has designed follow up metallurgical and mineral dressing programs to be conducted on new bulk samples.

Suitable research institutes have been identified in China to conduct the testwork and bulk sample shipment is scheduled to commence in the December quarter.

Circa 1.2 tonnes of mineralised toolebuc limestone (Coquina) was collected from existing gravel pits within the project area in early August 2017.

The bulk samples will be sent to at least two research institutes in China to conduct trial tests of mineral and metallurgical processing for the extraction of vanadium and molybdenum.

The testwork and reporting is expected to take around 18 – 20 weeks after samples arrive.

With a globally significant resource of 3.3 billion tonnes grading 0.4% vanadium and 295 g/t molybdenum and increasing interest in the energy storage space driving prices up, the companies are aiming to rapidly unlock the value of this project.

  • [Editor:Wang Linyan]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 张北县| 怀安县| 永清县| 德化县| 开原市| 红河县| 孟村| 微山县| 杨浦区| 南乐县| 苗栗市| 左云县| 垣曲县| 太谷县| 河间市| 香港 | 莎车县| 利辛县| 大余县| 城口县| 罗定市| 宜阳县| 汝南县| 花垣县| 丹江口市| 高安市| 虹口区| 伊宁县| 洛隆县| 凌云县| 海盐县| 达尔| 高州市| 吕梁市| 江城| 江油市| 巴中市| 嘉善县| 香格里拉县| 巫山县| 怀柔区|