掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Ivanhoe expedites construction at Platreef mine

  • Tuesday, July 28, 2020
  • Source:ferro-alloys.com

  • Keywords:Ivanhoe
[Fellow]Ivanhoe expedites construction at Platreef mine

[ferro-alloys.com]Ivanhoe Mines (TSX: IVN) has announced that its South African subsidiary, Ivanplats, has completed the construction of the 996-metre-level station at the bottom of the Shaft 1 at the Platreef mine.

In a press release, Ivanhoe’s co-chairmen Robert Friedland and Yufeng “Miles” Sun said that the work was finished well ahead of the contractual schedule.

According to Friedland and Sun, the Shaft 1 now is positioned to be equipped as Platreef’s initial production shaft. This, if Ivanhoe chooses to proceed with phased development to expedite production at the tier-one palladium-platinum-nickel-copper-rhodium-gold project located on the Northern Limb of South Africa’s Bushveld Complex.

“Given the flurry of recent transactions in precious metals markets, we are actively exploring a number of options that can help us unlock Platreef’s extraordinary value for the benefit of all Ivanhoe stakeholders,” Friedland said. “After all, Platreef is among this planet’s largest precious metals deposits.”

The operation now has a completed shaft within a few hundred metres of the initial high-grade mining zone. Friedland also said that it has a mining license, water, and a team of highly-skilled employees.

“The deposit has enormous quantities of palladium, platinum, rhodium, nickel and copper; and it has more ounces of gold than many leading gold mines,” Friedland said. “Given the current precious metals environment, I am confident that the pending studies will showcase the exceptional economics that one would expect from such a thick, high-grade and flat-lying deposit.”

Platreef’s current indicated mineral resources are 346 million tonnes grading 3.77 grams per tonne (g/t) 3PE+gold (1.68 g/t platinum, 1.70 g/t palladium, 0.11 g/t rhodium, 0.28 g/t gold), 0.32% nickel and 0.16% copper at a 2.0 g/t 3PE+gold cut-off.

These resources contain an estimated 26.8 million ounces of palladium, 25.6 million ounces of platinum, 4.5 million ounces of gold, and 1.8 million ounces of rhodium, plus 4.1 billion pounds of nickel and 2.1 billion pounds of copper, at a cut-off grade of 1 gram per tonne.

(Mining.com)

  • [Editor:王可]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 桦川县| 乌兰浩特市| 长宁区| 涟源市| 宣恩县| 五大连池市| 黎平县| 唐山市| 柞水县| 集贤县| 青海省| 明星| 中宁县| 宝清县| 寿阳县| 安义县| 蕲春县| 剑阁县| 甘肃省| 鄂托克旗| 昂仁县| 富蕴县| 天祝| 阜城县| 大同县| 舞钢市| 沙洋县| 盖州市| 保定市| 讷河市| 来凤县| 长岭县| 荣成市| 横峰县| 明光市| 石门县| 武定县| 丰都县| 深圳市| 高青县| 阿拉善左旗|