掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Millennial commissions lithium carbonate pilot plant at Pastos Grandes

  • Thursday, October 29, 2020
  • Source:ferro-alloys.com

  • Keywords:Millennial commissions,lithium, Argentina
[Fellow]Millennial commissions lithium carbonate pilot plant at Pastos Grandes

[ferro-alloys.com]Millennial Lithium (TSXV: ML) announced that the commissioning of a lithium carbonate pilot plant at its flagship Pastos Grandes project in Argentina is underway.

In a press release, the Canadian miner said that the pilot plant, located adjacent to the Pastos Grandes salt flat, is a full flowsheet design for producing up to three tonnes per month of battery-grade lithium carbonate.

According to Millenial, pilot ponds filled with brine pumped from the central part of the project and in operation since late 2018, are at the required concentration to provide lithium-rich brine concentrate to the pilot plant

“Despite covid-19 restrictions and minor delays, the Millennial team has advanced the lithium concentration ponds and the pilot plant to the production stage. Evaporation ponds have been concentrating lithium and plant feed,” Farhad Abasov, the company’s president and CEO, said in the media brief.

“The first stage of the plant, the Solvent Extraction (SX) unit to remove boron, has been installed and tested. The first output of battery-grade lithium carbonate is planned for Q4-2020 marking another significant milestone for the company.”

Abasov said that, at present, the pilot plant is being fed with concentrated lithium-rich brine from the smaller feeder ponds which had reached a grade of 2.7% Li, and expected to reach the target 3% Li with naturally reduced impurities by the time the full flow sheet is commissioned.

Located in northwestern Argentina, Pastos Grandes covers over 12,619 hectares. To date, Millennial has invested more than C$40 million in exploration and development work on the property, which includes 22 completed exploration/monitoring wells, four pumping test production wells, pilot ponds, the pilot plant as well as a year-round camp supported by a hybrid solar power system.

(Mining.com)

  • [Editor:王可]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 淮滨县| 吉木乃县| 常州市| 德令哈市| 浠水县| 左权县| 芒康县| 泗阳县| 贵港市| 镇康县| 二手房| 丰顺县| 辰溪县| 贞丰县| 遵义市| 当雄县| 崇信县| 静宁县| 黔江区| 邻水| 织金县| 北海市| 开江县| 武夷山市| 双牌县| 保德县| 高阳县| 皋兰县| 蓬安县| 贵港市| 乌拉特前旗| 尖扎县| 那曲县| 瑞安市| 呼玛县| 阳信县| 新化县| 富川| 龙川县| 北辰区| 泾川县|