掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Inner Mongolia plans to control the total amount of iron and steel and electrolytic aluminum

  • Wednesday, December 30, 2020
  • Source:ferro-alloys.com

  • Keywords:iron and steel,electrolytic aluminum,Inner Mongolia
[Fellow]Recently, in order to ensure the completion of the "fourteenth-five-year" energy consumption dual control target task, Inner Mongolia Autonomous Region drafted the "several safeguard measures for ensuring the "fourteenth-five-year "energy consumption dual cont...

[Ferro-Alloys.com]

  Recently, in order to ensure the completion of the "fourteenth-five-year" energy consumption dual control target task, the Development and Reform Commission of Inner Mongolia Autonomous Region, together with the Department of Industry and Information Technology and the Energy Bureau, drafted the "several safeguard measures for ensuring the "fourteenth-five-year "energy consumption dual control target task (draft for comments)".

  Accelerate the pace of energy-saving technological transformation in key high-energy consuming industries. From 2021 to 2023, the key energy consuming enterprises in thermal power, iron and steel, electrolytic aluminum, ferroalloy, calcium carbide, copper, lead and zinc, chemical industry, building materials and other high energy consuming industries will be transformed, and the energy consumption per unit will reach the advanced value of national energy consumption quota standard. Comprehensively promote the energy-saving transformation of coal-fired power units. Increase support for energy-saving technical transformation projects.

  Control the capacity scale of high energy consuming industries. From January 1, 2021, the new production capacity projects of ferroalloy, calcium carbide, PVC and cement (clinker) will no longer be approved, and projects, which approved before the end of 2020 but not yet started will be suspended or postponed. Steel and electrolytic aluminum industries are subject to total amount control. New capacity projects will no longer be approved, except for the projects that have completed or are in the process of capacity replacement and using flyash to extract alumina to produce electrolytic aluminum. Strictly control the new coke production capacity. Wuhai City, Ordos City and Alxa League implement equal capacity replacement on the basis of not breaking through the existing production capacity (including the projects started before the end of 2020). For other regions in China, except for the construction and utilization of coking coal which has been started before the end of 2020, new coke production capacity project will not be approved.

  Implement green electricity price policy. Since January 1, 2021, preferential electricity price for high energy consuming industries in West Inner Mongolia power grid will be cancelled, subsidy will be imposed on self-owned power plants, inverted step electricity price and basic electricity price conversion policy for high energy consuming industries will be adjusted, and differential electricity price and step electricity price policy will be improved. Improve the power trading scheme and adjust the trading mode. The adjustment scope and electricity price policy shall be separately issued by relevant departments.

  • [Editor:Catherine Ren]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 海安县| 马尔康县| 公主岭市| 寿宁县| 扶绥县| 开封市| 游戏| 佛坪县| 鄂伦春自治旗| 新和县| 辉南县| 资中县| 东乌珠穆沁旗| 枣阳市| 长顺县| 和龙市| 合水县| 旌德县| 宁乡县| 梓潼县| 化州市| 宁强县| 慈利县| 无锡市| 上犹县| 翼城县| 阿坝| 武平县| 台山市| 莲花县| 太谷县| 兴城市| 额济纳旗| 大宁县| 长葛市| 枝江市| 辉县市| 含山县| 屯留县| 志丹县| 方正县|