掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Inner Mongolia plans to control the total amount of iron and steel and electrolytic aluminum

  • Wednesday, December 30, 2020
  • Source:ferro-alloys.com

  • Keywords:iron and steel,electrolytic aluminum,Inner Mongolia
[Fellow]Recently, in order to ensure the completion of the "fourteenth-five-year" energy consumption dual control target task, Inner Mongolia Autonomous Region drafted the "several safeguard measures for ensuring the "fourteenth-five-year "energy consumption dual cont...

[Ferro-Alloys.com]

  Recently, in order to ensure the completion of the "fourteenth-five-year" energy consumption dual control target task, the Development and Reform Commission of Inner Mongolia Autonomous Region, together with the Department of Industry and Information Technology and the Energy Bureau, drafted the "several safeguard measures for ensuring the "fourteenth-five-year "energy consumption dual control target task (draft for comments)".

  Accelerate the pace of energy-saving technological transformation in key high-energy consuming industries. From 2021 to 2023, the key energy consuming enterprises in thermal power, iron and steel, electrolytic aluminum, ferroalloy, calcium carbide, copper, lead and zinc, chemical industry, building materials and other high energy consuming industries will be transformed, and the energy consumption per unit will reach the advanced value of national energy consumption quota standard. Comprehensively promote the energy-saving transformation of coal-fired power units. Increase support for energy-saving technical transformation projects.

  Control the capacity scale of high energy consuming industries. From January 1, 2021, the new production capacity projects of ferroalloy, calcium carbide, PVC and cement (clinker) will no longer be approved, and projects, which approved before the end of 2020 but not yet started will be suspended or postponed. Steel and electrolytic aluminum industries are subject to total amount control. New capacity projects will no longer be approved, except for the projects that have completed or are in the process of capacity replacement and using flyash to extract alumina to produce electrolytic aluminum. Strictly control the new coke production capacity. Wuhai City, Ordos City and Alxa League implement equal capacity replacement on the basis of not breaking through the existing production capacity (including the projects started before the end of 2020). For other regions in China, except for the construction and utilization of coking coal which has been started before the end of 2020, new coke production capacity project will not be approved.

  Implement green electricity price policy. Since January 1, 2021, preferential electricity price for high energy consuming industries in West Inner Mongolia power grid will be cancelled, subsidy will be imposed on self-owned power plants, inverted step electricity price and basic electricity price conversion policy for high energy consuming industries will be adjusted, and differential electricity price and step electricity price policy will be improved. Improve the power trading scheme and adjust the trading mode. The adjustment scope and electricity price policy shall be separately issued by relevant departments.

  • [Editor:Catherine Ren]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 静宁县| 文水县| 云安县| 江达县| 庆城县| 六枝特区| 寿阳县| 诏安县| 惠东县| 安图县| 高阳县| 西安市| 平原县| 日照市| 高平市| 连山| 津市市| 巴里| 平果县| 铜山县| 温州市| 抚远县| 台前县| 钦州市| 乌恰县| 吉安市| 红安县| 贺兰县| 开鲁县| 太康县| 新郑市| 孝义市| 福贡县| 上虞市| 怀集县| 通州市| 澄江县| 崇州市| 洪泽县| 津南区| 宜春市|