掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


BNC To Tap 8 000m Underground To Increase Nickel Production

  • Thursday, January 28, 2021
  • Source:ferro-alloys.com

  • Keywords:Nickel Ore Ferronickel Stainless Steel
[Fellow][Ferro-Alloys.com] LISTED nickel miner, Bindura Nickel Corporation (BNC) has tabled a plan to increase its extraction resource base to 8 000 metres in line with the miner’s new strategic priority.

[Ferro-Alloys.com] LISTED nickel miner, Bindura Nickel Corporation (BNC) has tabled a plan to increase its extraction resource base to 8 000 metres in line with the miner’s new strategic priority.

In a recent update, BNC chairperson, Muchadeyi Masunda said the strategy will go a long way in sustaining the mineral’s output.

“The company will ramp up development from 3 330 metres to 8 000 metres over the next five years in order to sustain the production of 10 000 tonnes of nickel per annum. In order to extend the current BNC ore resources, exploration work will be carried out at Trojan Mine,” he said.

He said near-mine resources such as Trojan Hill and Kingstone Hill, in addition to Hunter’s Road and Damba-Silwane will also be included.

“The Trojan Mine Re-deepening Project (Phase 1) 2will enable the mine to extend its ore and waste handling facilities downdip by an additional 240 metres. It is 87% complete and is expected to be commissioned by April 2021,” Masunda said.

Leveraging on the above-mentioned huge in-situ Nickel resources under its portfolio, BNC aims to produce 10 000 tonnes of nickel per annum by 2025.

The key strategic advantages which BNC will exploit in order to achieve its set objective are: huge low grade resource: availability of a confirmed huge low grade disseminated resource of approximately 6.98 million tonnes of an average grade of 0.77% at Trojan Nickel Mine, which will support a high volume strategy

BNC also intends to take advantage of large and under utilised processing capacity at Trojan Nickel Mine which has a sound processing plant with 56% excess capacity at current production rates.

The plant has an installed capacity to process up to 1 million tons per annum.

BNC has nickel resources across Zimbabwe under mining, processing and exploration assets. These are Trojan Mine, Shangani Mine, the BSR (formerly Bindura Smelter and Refinery) facility, Hunter’s Road Project, Damba-Silwane and the Trojan Hill and Kingstone Hill Prospects.

Collectively, these resources amount to a total of 71.4 million tonnes of ore at an average grade of 0.59%, containing approximately 420.8 kilo-tonnes of nickel.

  • [Editor:tianyawei]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 宁陵县| 海阳市| 方山县| 浏阳市| 冷水江市| 蕲春县| 辽中县| 乌海市| 莒南县| 伊宁县| 阜城县| 淳安县| 石台县| 吴忠市| 凤冈县| 舟山市| 即墨市| 阜平县| 望都县| 定州市| 仪陇县| 绥芬河市| 大同市| 福泉市| 汽车| 博兴县| 体育| 佛冈县| 扎鲁特旗| 塘沽区| 惠东县| 青州市| 广水市| 崇阳县| 施秉县| 徐州市| 宁津县| 耿马| 黄骅市| 桦甸市| 阳东县|