掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


VetroSGC2 Gets Permit for Berestovskaya Wind Farm in Stavropol

  • Tuesday, June 22, 2021
  • Source:ferro-alloys.com

  • Keywords:wind,power,Stavropol
[Fellow]VetroSGC2 Gets Permit for Berestovskaya Wind Farm in Stavropol

[Ferro-Alloys.com]ROSATOM’s wind energy division NovaWind JSC’s VetroSGC-2 JSC has obtained the permit for the construction of the Berestovskaya wind farm with a total capacity of 60 MW in the territory of Petrovskiy urban district in Stavropol Krai. The permit was preceded by a positive expert examination of design documents issued by State Expertise in Construction, the Stavropol Krai Autonomous Institution, for the construction of a wind farm that includes 24 wind turbines with a capacity of 2.5 MW each.

Successful expert examination confirms that the design documents for construction facilities comply with the site investigation results and the requirements specified in all technical regulations, in particular environmental, sanitary, epidemiological, fire safety requirements, regulatory and technical documentation and the Urban Development Code of the Russian Federation.
 
The Stavropol Krai is a key region for the projects implemented by NovaWind JSC. At present, two large wind farms – Kochubeyevskaya wind farm (210 MW) and Karmalinovskaya wind farm (60 MW) – have been commissioned in this region. In addition, wind farms construction for a total capacity of about 180 MW is under way in the region.
 
source:SteelGuru Business News
  • [Editor:李慧]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 阳东县| 德格县| 白玉县| 金湖县| 宜兰县| 洛宁县| 秭归县| 修武县| 江西省| 宜兰市| 大埔县| 焉耆| 绥化市| 鄂托克前旗| 吉水县| 葫芦岛市| 蛟河市| 江川县| 南召县| 绍兴县| 湖北省| 铁岭县| 潜山县| 孟连| 炎陵县| 嘉善县| 渭源县| 古田县| 西吉县| 抚州市| 澄江县| 正镶白旗| 凤冈县| 福清市| 华坪县| 东阳市| 定安县| 尼木县| 鸡西市| 凤山县| 门头沟区|