掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


AVL RECEIVES $618,904 R&D REFUND FOR 2020/21 TAX YEAR

  • Monday, November 21, 2022
  • Source:ferro-alloys.com

  • Keywords:Ferroalloy, Vanadium, Molybdenum, Tungsten, Manganese Ore, Chrome Ore,Iron Ore
[Fellow]AVL RECEIVES $618,904 R&D REFUND FOR 2020/21 TAX YEAR

[Ferro-Alloys.com] AVL RECEIVES $618,904 R&D REFUND FOR  2020/21 TAX YEAR

KEY POINTS

$618,904 received from Australian Federal Government Research & Development (R&D) Tax Incentive Scheme

Refund applies to work undertaken in 2020/21 tax year

R&D activities support technical strength in AVL’s processes

Innovative work includes:

Production of high purity 99.4% vanadium pentoxide (V2O5) using simplified circuit1

Energy efficiency and world leading vanadium extraction from pyrometallurgy roast-leach testwork2

High vanadium extractions of greater than 92% in two-stage leach process34

Production of FeTi coproduct representative samples5

Unique vanadium processing circuit to be protected through patent application6

Australian Vanadium Limited  is pleased to announce that it hasreceived $618,904 from the Australian Federal Government’s Research and Development (R&D) Tax Incentive Scheme for the 2020/21 tax year.

Administered jointly by the Australian Taxation Office (ATO) and the Department of Industry, Science, Energy and Resources, the self-assessment scheme encourages companies to engage in R&D benefiting Australia, by providing a tax offset for eligible activities.

Managing Director, Vincent Algar comments, “The R&D scheme is an excellent program which encourages companies to develop their processes and find innovative ways to achieve the best results. AVL has undertaken industry leading work over the past few years and the 2020/21 program included work that was vital for inputs into the Bankable Feasibility Study (BFS) which was released earlier this year. 7 The Company continues to set itself apart from other vanadium projects, through thorough testing and research work which enables scaling during project build to be as far de-risked as is possible. Doing this work before construction reduces project cost blowouts and issues having to be resolved once processes are in place – a problem that has been seen in many projects over the years where technical work has not been as robust.”

AVL’s R&D work for the period during 2020/21 was focused on development of processing techniques to produce steel and battery grade vanadium pentoxide and vanadium electrolytes, while recovering iron and titanium from a vanidiferous titanomagnetite (VTM) ore. Work was also undertaken on pilot scale pelletising and roasting of AVL concentrate utilising a grate kiln; hydrometallurgical process testwork; process work to recover titanium and iron from waste streams; production of FeTi coproduct samples; concentrate recovery variability testwork and vanadium electrolyte analysis.

AVL’s unique combination of physical beneficiation, pyrometallurgical and hydrometallurgical steps has been combined to underline a patent application which was published by the International Bureau in October 2022. The AVL team continues to advance the Australian Vanadium Project at Gabanintha towards a development decision.

  • [Editor:tianyawei]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 白水县| 龙岩市| 县级市| 灌云县| 宽城| 迁西县| 山西省| 安龙县| 海阳市| 云霄县| 丘北县| 长岭县| 将乐县| 岳阳县| 汕尾市| 拉萨市| 聂拉木县| 阜新市| 湛江市| 苗栗市| 岢岚县| 托克逊县| 怀来县| 东丽区| 米泉市| 衡东县| 饶河县| 同德县| 遂平县| 义乌市| 和政县| 长顺县| 长汀县| 保山市| 延津县| 新巴尔虎右旗| 慈利县| 通州区| 治县。| 开江县| 顺昌县|