掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Glencore/Xstrata’s first-quarter nickel production decreases

  • Monday, May 20, 2013
  • Source:

  • Keywords:Glencore Xstrata’s quarter 1 nickel production
[Fellow]
Glencore/Xstrata’s first-quarter nickel production was 25,500 mt compared to 24,600 mt in the first quarter of 2012. The Nikkelverk refinery in Norway produced 22,300 mt roughly the same as in the first quarter of 2012. Ferronickel output from Falcondo rose 3% over the 2012 first quarter to 3,700 mt due to greater volumes of ore mined and improved nickel head grades. Australian nickel operations produced 8,700 mt of nickel metal (6,300 mt in the first quarter of 2012) and 1,400 mt (3,600 mt) of nickel in concentrates, which meant that total nickel output was roughly the same in the first quarters of 2012 and 2013. Production of nickel metal at Murrin Murrin rose 38% because the acid plant was shut during the first quarter last year. Australian nickel in concentrate production fell 61% because the Cosmos mine was placed on care and maintenance in the third quarter of 2012 and the Sinclair mine is reaching the end of its mine life with production expected to cease on May 15. 
 
  • [Editor:editor]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 柏乡县| 义乌市| 涿鹿县| 同德县| 卢湾区| 桂东县| 车险| 旅游| 黑龙江省| 田东县| 新乡市| 香格里拉县| 天水市| 凤台县| 扶绥县| 永和县| 方正县| 五莲县| 古蔺县| 西乌| 新巴尔虎右旗| 洪雅县| 永城市| 防城港市| 桑植县| 三台县| 大田县| 陇川县| 万源市| 嘉义市| 沛县| 溧水县| 青冈县| 东丰县| 常山县| 金秀| 阿合奇县| 鸡泽县| 甘肃省| 牟定县| 天全县|