掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


MinRes resumes Onslow haulage after safety review

  • Tuesday, March 25, 2025
  • Source:ferro-alloys.com

  • Keywords:market, mining industry,mine,steel,iron ore,
[Fellow]Diversified miner Mineral Resources (MinRes) has resumed haulage operations on the Onslow Iron dedicated haul road after reaching an agreement with WorkSafe WA on safety controls and risk mitigations.
‌‌
Connect with Industry Leaders, Exchange Innovations & Forge Partnerships.‌ May 28-30, 2024 | Beijing, China   
E-mail: weixin@ferro-alloys.com        Tel:+86 15343160065

【Ferro-alloys.com】: Diversified miner Mineral Resources (MinRes) has resumed haulage operations on the Onslow Iron dedicated haul road after reaching an agreement with WorkSafe WA on safety controls and risk mitigations.

The company confirmed that haulage recommenced on Friday evening, following a temporary suspension prompted by a crash earlier in the week.

MinRes said its previously announced A$230-million works programme to upgrade the haul road remained on track for completion in the first quarter of the 2026 financial year.

Meanwhile, MinRes has also expanded its transhipping capacity at the Port of Ashburton, with the MinRes Rosily - its fourth transhipper - commencing operations on Saturday. This increases Onslow Iron’s transhipping capacity to 28-million tonnes a year.

The company reaffirmed its full-year volume guidance for the iron-ore project.

The haulage suspension came after an incident last Monday in which two trailers of a road train overturned, though the prime mover and first trailer remained upright, and the operator was unharmed. Alternative contractor vehicles were used to continue operations while the dedicated haul road was closed.

According to the Australian Financial Review, the crash was the sixth on the Onslow network, raising concerns about the safety and design of the 150-km road, which was completed in October last year. Issues with the spray seal and binder have been exacerbated by high temperatures, water ingress, and heavy loads, with recent flooding events further affecting the pavement in certain sections.

MinRes has committed significant investment to road repairs, including seal binder upgrades, cement stabilisation in some areas, and asphalting across the entire length of the haul road.

“The Onslow haul road is the most substantial heavy haul road that’s ever been built in the world,” MinRes MD Chris Ellison said in a recent conference call.

  • [Editor:Alakay]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 霍林郭勒市| 米易县| 四川省| 灌南县| 武山县| 平舆县| 寿阳县| 乃东县| 肥乡县| 鸡东县| 古丈县| 营山县| 浪卡子县| 英超| 手游| 灵寿县| 怀来县| 乾安县| 湖南省| 兴业县| 梓潼县| 衡山县| 南阳市| 长岛县| 湖州市| 壶关县| 大埔区| 新龙县| 化州市| 济南市| 株洲县| 永清县| 神农架林区| 八宿县| 怀集县| 怀柔区| 泰来县| 阜阳市| 安新县| 南乐县| 肇东市|