掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Bushveld's vanadium production up 24% y/y

  • Friday, February 5, 2021
  • Source:ferro-alloys.com

  • Keywords:vanadium,vanadium oxide,Vanchem,magnetite,Bushveld,Bushveld Energy,Bushveld Minerals,vanadium production
[Fellow]Aim-listed vanadium miner Bushveld Minerals has achieved a 24% year-on-year increase in vanadium production from its high-grade assets in South Africa.
Aim-listed vanadium miner Bushveld Minerals has achieved a 24% year-on-year increase in vanadium production from its high-grade assets in South Africa.
The company produced 3 631 t in the 12 months ended December 31, 2020, compared with the 2 931 t of vanadium produced in the prior year.
The company, led by CEO Fortune Mojapelo, attributed the higher production primarily to the inclusion of Vanchem’s production for the full year, despite a partial offset caused by the impact of the nationwide lockdown instituted in March.
Production was, however, lower than the guidance that the company had set out at between 2 660 t and 3 940 t.
Meanwhile, increased demand from customers during the second half of the year, and the addition of sales from Vanchem, led to a 78% year-on-year increase in group sales to 4 264 t.
Bushveld says sales to China made up 21% of total volumes sold in 2020, compared with 10% in 2019.
Meanwhile, subsidiary company Bushveld Energy successfully established its Bushveld Electrolyte Company as the operational company for the group’s electrolyte business.
The engineering phase of the engineering, procurement and construction (EPC) process was completed in the fourth quarter of last year. The procurement process will follow before the end of the first quarter of this year.
Bushveld, in the year under review received environmental authorisation to proceed with the construction of a hybrid minigrid at Vametco.
Energy storage subsidiary of Bushveld, Enerox, will supply the 1 MW vanadium redox flow battery for the project and Spanish infrastructure company Abengoa will manage the EPC of the project, which will include a 3.5 MW solar photovoltaic plant.
The company had cash on hand of $50-million at the end of December, and it plans to spend about $33-million in capital expenditure across the portfolio this year.
Its production guidance has been set 13% higher this year at between 4 100 t and 4 350 t.
The company’s flagship vanadium platform includes a 74% controlling interest in Bushveld Vametco Alloys, a primary vanadium mining and processing company; 100% of Bushveld Vanchem, a primary vanadium processing facility with a beneficiation plant; the Mokopane vanadium project; and the Brits vanadium project.
The company also announced that its ore reserves have been depleted by about 2% from the previous ore reserve estimate as at December 31, 2019, after 12 months of mining.
As at December 31, 2020, ore reserves have been stated at 267 200 t of vanadium oxide in magnetite, at a grade of 2.02%.
Mojapelo comments that there was no significant change in Bushveld’s ore reserve in the past 12 months, except for the depletion that occurs in the ordinary course of mining the deposit.
 
Source: www.miningweekly.com
  • [Editor:wenxin]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 隆昌县| 韩城市| 进贤县| 吐鲁番市| 普安县| 固安县| 永康市| 莱阳市| 乳山市| 泽州县| 务川| 佛学| 陇西县| 类乌齐县| 淳化县| 大新县| 文昌市| 肥西县| 太谷县| 游戏| 津市市| 阳谷县| 塔河县| 遵化市| 石屏县| 临澧县| 麻阳| 大英县| 东乌| 会理县| 渑池县| 井陉县| 肥城市| 准格尔旗| 石家庄市| 庄浪县| 开封县| 永德县| 临泉县| 平罗县| 固镇县|